BP, Chevron, and Talos Energy received disappointing results this week from its Puma West-2 appraisal well, Talos said. The Puma West-2 appraisal well was drilled to a depth of 25,995 feet followed by a sidetrack, which was drilled geologically down-dip to a total depth of 27,650 feet. While the appraisal wells did encounter hydrocarbons in multiple sands, additional hydrocarbons from a subsequent well or sidetrack are necessary before they consider moving forward with the project. The Puma West 2 wellbore was suspended temporarily with utility…